Monday, March 17, 2008

Missionary TECH Team, Longview TX Jan-Mar 2008

What a blessing to be able to serve the needs of our Home Base ministry, Missionary TECH Team at 25 FRJ Drive in Longview, TX. The Lord led us to visit Missionary TECH Team in 2004 when we were searching for a ministry that was doing what we are doing now or something similar. As it turned out, we developed our ministry from scratch, but we are indebted to Birne Wiley and the TECH Team mission for opening their doors to us to explore how God would use them in our lives. Since 2004, the Missionary TECH Team address has been our home base of operations.

Missionary TECH Team (http://www.techteam.org/) is remodeling and expanding their building. This project includes tearing out existing parking lot, curbs and sidewalk to make room for the expanded footprint and building a new 25-space parking lot. Every effort was made to save mature plants and trees and many were immediately transplanted to their new 'homes' (a successful effort as of this writing).



PARKING LOT: These early pics are of the original parking lot. The entrance from the main road was torn out and a concrete curtain was installed (below).


The completed entry apron & driveway/parking lot (ready for asphalt).


Rather than haul off the asphalt and bring in gravel, Darren and the TECH Team leadership decided to rent a power planer and recycle the existing asphalt material. But first, Darren had to put his Oregon Logger skills to work and fall two large pines:


The big excavator then made quick work of limbing the trees and hauling off the logs and brush. (notice the tall evergreens in the background. You'll be seeing these again soon...)

This is the completed driveway & parking lot. ready for the asphalt crew.


TRANSPLANTING: Another step before tearing out the parking lot was to remove the sidewalk and landscaping next to the building (this is where the addition will be). The goal was to preserve as many of the existing, mature plants & trees as possible.

These trees had been in the path of the pines. They were moved to a new location first.



All the trees & bushes you see here have been moved. The bushes are in a temporary location until the construction is complete. Now watch what happens to the trees!

The goal was to relocate all the tall evergreens to each of these stakes. This is opposite the building on the far side of the new parking lot area.
It was a beautiful day to plant a tree -- or should we say uproot a tree!


This is Bill Daniel, resident missionary landscape architect at Missionary TECH Team, measuring to be sure the plantings are square.


After all the plants & trees were moved we had several good rains. It was perfect timing to help nourish the trees in their new locations. As of this writing, they are still doing great. This year was perfect timing, too, because last year they had drought and it would have been difficult to keep these plantings alive. We continue to see how God cares about the details.

The completed transplantings, grading & sprinkler system installed.



MORE PARKING LOT WORK: A volunteer work crew from Steppin' Out Ministries came to Missionary TECH Team to assist with the building renovation. That crew was assigned to create the forms for the parking lot medians. They employed Darren's assistance to set the grade and find the level.


Finished & filled median, light pole base to the left of the median was installed by Darren also.


The asphalt was ground off with a power planer and that material (like gravel) was used to create a base for the temporary driveway. The power planer provided a cost-effective and efficient alternative to the traditional method of hauling off the old asphalt (paying a dump truck and a landfill) and bringing in gravel.




Several rain storms caused delays in the project, but each time Darren had enough warning to get the grade to where he wanted it so that it would drain.

Bringing in fill (harvested from the back of TECH Team's own property using a rented dumptruck) to build up the building pad.

Grading & compacting at the building pad site

The completed building pad (below).






Grading & compacting fill for the parking lot (below).






Monday, December 3, 2007

Alliance Redwoods Conf. Grounds, Occidental, CA Nov. 2007

Alliance Redwoods Conference Grounds entrance

Alliance Redwoods Conference Grounds in Occidental, CA (near Santa Rosa)is a beautiful place deep in the Redwood rainforest on the CA coast. Darren connected buidlings to existing water, restored one retaining wall and built another and repaired drainage. We were there for about six weeks. Darren had much help with existing staff members.

All the pictures seem dark, not because we were working at night, but because the forest canopy is so dense that it is quite dark even at high noon.

Retaining Wall Repair. It is a retaining wall/seating area serving a group of cabins. The wall was eroding away. They tore it down, sunk sonotube 5' deep and filled with concrete around each support. Then backfilled the area, compacting it every few feet. The wall and seats were then re-installed. It's not going to move now!









Tearing down the existing wall


Setting the upright posts




This is camp staff working with Darren


Making sure it's all on the level




Improving/Repairing Drainage: This camp is situated around a creek at the bottom of a 700' deep ravine. Winter rains here cause major, major runoff down the hill. Some buildings have become flooded as the water goes where it wants. Darren regraded the land in several areas around the camp and we have current reports that during winter 2007/2008 there was no water in the buildings and the surrounding areas were not holding water as they had in the past.




Over time, this hillside had fallen down to the building footer. Darren's chore was to pull the dirt away and build a retaining wall to protect the building from water seepage and dryrot.


Building the retaining wall behind a building to hold back erosion away from the structure

WATER LINE INSTALLATION: The camp had a new 4" water main installed but still needed all the buildings to be connected to the new water. With help from the camp staff, Darren connected several buildings to water. Working around all the trees and tight proximity between buildings posed a challenge which was easily met by the mini-excavator, wheel barrows, and 5 gallon buckets. Having a full-time helper on this portion of the project was extremely helpful.






Dumping fill into a wheel barrow to be carted down the hill, covering recently-laid pipe by a building








Beyond the excavator, you can see the steep hill and the close proximity of cabins and trees on this water-line project.


Tuesday, October 23, 2007

Twin Rocks Friends Camp - Aug 2007

We were at Twin Rocks Friends Camp (TRFC) in Rockaway Beach, OR during the month of August. The weather was beautiful and we'd have to say that the working conditions were absolutely perfect. The soil was soft and free of rocks, ground water, and utilities (in general). Darren had consistent assistance through the entire project with the help of the camp's maintenance staff. The weather was PERFECTION for working outside. It was a little cold for swimming, but perfect for sweating in a trench!

We are impressed with how much the Lord allowed us to accomplish on this project. The perfect soil and working conditions were instrumental in the following tasks completed in FOUR WEEKS.
  1. 275' Sewer line installed
  2. 350' Rain drains installed
  3. 1200' of 2" water line installed
  4. 5 concrete underground utility vaults installed
  5. Built a 50' turnaround roadway for vehicle access to cabins
  6. Re-graded 100'x200' ball field
  7. 1200' underground power conduit installed
  8. 700' of 6" water line installed with a tap into water main
  9. 200' underground boring for utilities (to avoid tearing out sidewalks and trees)
  10. Crossed underground utilities 20 times
  11. Repaired all the land after trenching & installing (ready for grass seed)
  12. Graded roads
That's quite a list! Darren worked an average of 45 hours per week August 1 to Sep 6. He used all our own equipment plus the camp's dump truck and loader. No outside equipment was necessary for this work. The camp provided staff assistance whenever needed which helped to get the pipe laid and glued and the camp staff did all the materials runs.

Here are some pictures:

Underground utilities -- adding a fire hydrant

Water Line -- Tapping into the Main

Horizontal Boring



Underground Utility Vault


While we can't guarantee these results on every project, we thought it would be good to demonstrate the amount of work HighTouch Ministries can accomplish with good support from the ministry and with God's help. We praise God each day for job safety!

The TRFC Executive Director, Ken Beebe, said we saved their ministry $20,000 -- PTL!!